We work on Saturdays to shorten the delivery time.
Thus, we can deliver on Mondays after a day off.
List of delivery time by materials
Material | Normal treatment (quenching + low temperature tempering) |
High temperature tempering (quenching + high temperature tempering) |
High temperature tempering 2 to 3 times (quenching + high temperature tempering 2 to 3 times) |
---|---|---|---|
Cold work die steel (SKD-11 group) |
Next day | 2 days | 2 to 3 days |
Hot work die steel (SKD-61 group) |
――― | 2 days | 2 to 3 days |
SKs (Carbon tool steels) (SKS, SCM group) |
Next day | 2 days | ――― |
High speed tool steel (SKH, YXR group) |
――― | N/A High temperature tempering 3 times required. |
3 to 4 days |
Sub-zero products | 2 days The products arriving on Fridays will not be treated. |
2 to 3 days The products arriving on Fridays will not be treated. |
3 to 4 days The products arriving on Fridays will not be treated. |